In order to achieve a compact chamber, we had to consider the complete design of the assembly. The result of this was a pair of welded assemblies in the control chamber, that could be placed in the chamber with considerable space saving. Due to the use of these assemblies smaller chambers were required with lower construction costs.

Requirements

  • compact control chamber
  • simpler exchange of the valves in the case of maintenance

Specifications

Size d
400 mm
Size DN/OD
350 mm
Werkstoff
PE 100
SDR
11