Project OOWV at Edewecht, Germany

New construction potable water main pipeline (20km)

Project details

Description

First deployment of a 45° branch in full pressure rated realisation in dimension d 710/500mm. Subsequent projects were performed in d 900mm and d 1100mm. In comparison to the use of cast iron fittings some 600,000 € were saved in project costs (pipe, fittings and smaller valves with the implementation of the reduced flange solution).

Advantages

  • space saving
  • fluid flow advantages
  • long life

Requirements

Full pressure rated for PE pipe and connectors.

Specifications

Size d
710 mm
Size DN/OD
600/500 mm
Werkstoff
PE 100
SDR
17 & 11

Used products

More case studies