Upgrading a pumping station
Project details
Description
The extension of existing pipeline networks is always a challenge, most often due to the restricted space available and the required allocation of additional branch pipes. So in this case where the pipeline network of a pump station was extended by 2 addition pipelines that made branches of 79°, 71°and 68°nessesary, re-joining the main DN 400 PN 10 pipeline. The design of the component meeting precisely the required angles of the branches, saved a considerable amount of time during the expansion of the pump station pipeline system.